page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47 page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
< prev - next > Energy Biogas Biogas Digest Vol 2 (Printable PDF)
Construction Details of Biogas Plants
This section provides detailed information on materials and devices used in the construction
of biogas plants:
Checklist for construction
Agitation
Heating
Piping systems
Plasters and Coats
Pumps
Slurry equipement
Underground water
Checklist for building a biogas plant
1. Finishing the planning, i.e. site evaluation, determination of energy demand and
biomass supply / biogas yield, plant sizing, selection of plant design, how and where to
use the biogas, etc., in accordance with the planning guide
2. Stipulate the plant’s location and elaborate a site plan, including all buildings, gas
pipes, gas appliances and fields to be fertilized with digested slurry
3. Draft a technical drawing showing all plant components, i.e. mixing pit, connection to
stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage
4. Preparation of material / personnel requirements list and procurement of materials
needed for the chosen plant:
bricks / stones / blocks for walls and foundation
sand, gravel
inlet / outlet pipes
metal parts (sheet metal, angle irons, etc.)
gas pipes and fittings
paint and sealants
gas appliances
tools
mason and helper
unskilled labor
workshop for metal (gas-holder) and pipe installation
5. Material / personnel assignment planning, i.e. procedural planning and execution of:
excavation
foundation slab
digester masonry
gasholder
rendering and sealing the masonry
mixing pit - slurry storage pit
drying out the plant
installing the gas pipe
acceptance inspection
6. Regular building supervision